Commissioning day at a hotel entrance
Commissioning day at a hotel entrance. The flood wall rose from its basin in under a minute, held the test water at the threshold and sank back flush. The reception stayed dry, and the guests never saw it.
The system was chosen at the first sketch of the arrival court. The architect wanted a threshold that reads as one continuous plane of stone, from the street to the reception desk, with nothing standing on it.
The wall lives in a basin below the paving, drained and serviced from the side, so that nothing has to be lifted from the stone to maintain it. Its top edge closes flush with the floor and carries the same finish as the threshold.
On commissioning day the wall rose in under a minute and held the test water for an hour. Then it sank back, the stone dried, and the hotel opened its doors as usual. Our local team now holds the maintenance contract and answers a call within 24 hours.