Commissioning day at a hotel entrance

A flood wall risen across a hotel entrance during a water test

Commissioning day at a hotel entrance. The flood wall rose from its basin in under a minute, held the test water at the threshold and sank back flush. The reception stayed dry, and the guests never saw it.

The system was chosen at the first sketch of the arrival court. The architect wanted a threshold that reads as one continuous plane of stone, from the street to the reception desk, with nothing standing on it.

The wall lives in a basin below the paving, drained and serviced from the side, so that nothing has to be lifted from the stone to maintain it. Its top edge closes flush with the floor and carries the same finish as the threshold.

On commissioning day the wall rose in under a minute and held the test water for an hour. Then it sank back, the stone dried, and the hotel opened its doors as usual. Our local team now holds the maintenance contract and answers a call within 24 hours.

Read on LinkedIn →
The flood wall risen across the full width of a hotel entrance, holding test water outside a dry reception Enlarge photograph
The wall up: test water held at the threshold.
A hotel threshold after the test, one continuous plane of stone with a single flush steel line Enlarge photograph
Twenty minutes later: one steel line in the stone.
An engineer with a checklist and a technician inspecting a drained basin through an open service hatch Enlarge photograph
The basin, drained and serviced from the side.